+91 98956 62222

CLEARWAY ASTRUM

PROJECT OVERVIEW

Clearway Astrum, the latest from the brand radiates quality living. Strategically located at the expanding locale of Chittoor, near Aster Medcity, you are at a vantage.

Lying midpoint between Edappally and Marine Drive on the beautiful stretch of Queen’s Way, the 2 & 3 BHK premium home spaces is sure set to be one of its kind.

ABOUT THE PROJECT

Floors - 10

Location - Near Aster Medcity, Kochi

Total apartments - 40

Work Started - Ongoing

Completed -

Status - New Launch

Building Permit no - C4-807/15 (Cheranalloor Panchayath)

  • Overview
  • Floor Plans
  • Amenities
  • Specifications
  • Gallery
  • Construction Updates
  • Location Highlights
  • Location Map
  • E-Brochure

Overview


Clearway Astrum, the latest from the brand radiates quality living. Strategically located at the expanding locale of Chittoor, near Aster Medcity, you are at a vantage.Lying midpoint between Edappally and Marine Drive on the beautiful stretch of Queen’s Way, the 2 & 3 BHK premium home spaces is sure set to be one of its kind.

Floor Plans

Amenities

Designer Lobby

Health Club

Roof Top Recreation Area

Roof Top Garden

Children's Play Area

Fully Automatic Lifts with automatic rescue device

Reticulated Gas Supply

Sewage Treatment Plant as per KSPCB norms

Intercom

Water Filtering Unit

STRUCTURE

Earth Quake Resistant RCC framed structure.

INTERNAL AND EXTERNAL MASONRY

The masonry unit used shall be solid / cellular of cement concrete blocks / burnt bricks / burnt clay blocks/ lightweight masonry blocks.

FLOORING

General floor - Good Quality Vitrified.
Toilet - Vitrified / ceramic tiles.
Balcony - Good Quality Vitrified / ceramic tiles.

WALLS AND CEILING

Internal walls - 2 coats of Acrylic emulsion on putty finish.
Ceiling - Acrylic emulsion on putty finish.False ceiling for toilets with matching colour.

KITCHED AND KITCHEN YARD/ WORK AREA

Kitchen will be provided with Sufficient electrical & plumbing points . Provision for Hob & Chimney and exhaust fan etc.Glazed tile up to a height of 2 feet above kitchen counter.

DOORS AND WINDOWS

Entrance door - Well Seasoned Teak wood doors frame and shutters.
Internal Doors - Hardwood door frame with moulded / laminate flush door.
Windows - Made of powder coated Aluminum Windows.
Balcony Door - Made of powder coated Aluminum sections with Sliding /fixed / open able panels.

GRILLS AND RAILINGS

Window safety Grill - Part Grill of Mild Steel for windows or handrail on window sunshade.
Balcony Railing - Railing of Mild Steel / Masonry or Combination of any of these.

ELECTRICAL

General - Concealed wiring with superior quality PVC insulated copper cables , Adequate light, fan, plug points controlled by ELCB and MCB, Independent Energy meter for each Apartment.
Switches - Modular Switches.
Generator Backup - Generator back up for lights and fan.
TV point provision - TV provision in living and Master bedroom.
Telephone point provision - Telephone provision in living and Master bedroom.
Air-conditioning provision - Provision to fit Split type air conditioner shall be provided for all bedrooms with energized power point. Provision to fit Split type air conditioner shall be provided for living /dining with dummy power point –energizing by power point shall be done at extra cost.

PLUMBING AND SANITATION

EWC Water Closets - All bathrooms with western style wall mounting closet with concealed cistern EWC.
Wash basins - All bathrooms with Wash basins above counter/ below counter / bowl type.
Taps - CHROMIUM PLATED BATHROOM FAUCETS
Hot and Cold water provision - Hot and Cold Water tap provision shall be provided with mixing facility for kitchen sink and all bath mixer taps.

WATER SUPPLY

Water Supply through underground sump tank and overhead tank of sufficient storage capacity.

BUILDING-FIRE FIGHTING

Fire Fighting arrangements as per the Kerala Fire and Rescue Department Norms.

RETICULATED LPG GAS

Reticulated LPG GAS with individual consumption metering system subject to the government rules prevailing at that time at extra cost.

LIFT

Lift with Automatic rescue Device.

GENERATOR BACKUP

Generator backup of adequate capacity with automatic change over facility of lifts , common area , lobby , yard lighting treatment plants , water pumps , lights etc

Location Highlights

Container Terminal Road - 4 min

Aster Medicity - 3 Min

Lulu Shopping Mall - 15 min

Amrita Institute of Medical Science - 15 min

Chinmaya Vidyalaya - 12 min

Marine Drive - 15 min

Centre Square Mall - 18 min

Cochin International Airport - 38 min

Location Map

Brochure Download

brochure

Copyright © 2017. Clearway Builders. All Rights Reserved. Powered by Dreamnetz

Disclaimer

The information provided in the website is for general guidance only.Though we have taken utmost care on the accuracy of the contents, the customer should make autonomous assessment of the contents. However, the prospective buyers should rely upon the terms and conditions of the sale and construction agreement betweenthe builder and the client.

The visuals of the property /apartmet/villa symbolize artistic impression only.The information conatined herein including the fittings,finishes,features,floor size and colour etc.in the visuals are subject to change.However, the plans and specifications indicated in the Builder and the client agreement are final and we have not authiorised anyone to make any oral commitments or promises on behalf in regard to the plans and specifications of the apartment or villas.

For any clarifications please feel free to call +91 9895662222 or walk into our offices.Our representatives will be always at your service.